Options · Types, decks, stairs and gates
Mezzanine Options for Seattle Warehouses and Plants
Pick a type and its framing, then a deck surface, stairs, gates and any lift or extra. Everything is ordered through us and installed by our crew, as part of our mezzanine installation in Seattle. Each frame is designed for the city's earthquake code.

02Types
Which Mezzanine Type Suits Your Seattle Building?
The work on the deck chooses the type: storage, order picking, offices or machinery. A free-standing steel frame needs no rack or wall for support, so the floor below stays open. A rack- or shelving-supported deck rests on the storage frames below it. A modular deck arrives as a kit of bolted standard parts. A pick module stacks picking levels, often joined by conveyor. In Seattle, each of these counts as a mezzanine under SBC 505.2. Each needs 7 feet of clear height above and below. Inside city limits, all mezzanines in one room may total one-half of its floor area (SBC 505.2.1). A platform that holds only machinery is an equipment platform under SBC 505.3 instead.
-

Structural steel mezzanine
Its own columns and beams, braced for earthquakes, with open floor beneath. Steel mezzanine details.
-

Rack-supported mezzanine
Upright frames of the pallet rack hold up the walkway, and RMI ANSI/MH 16.1 governs the rack design. Rack-supported decks.
-

Shelving-supported mezzanine
A second tier of parts shelving with a walkway between the rows and its own stair.
-

Modular mezzanine
A kit of bolted parts you can extend or relocate, designed for earthquake motions like any frame. Modular kits.
-

Pick module
Stacked picking levels on rack, usually linked by conveyor. Pick module layouts.
-

Work or equipment platform
Room for machines, air handlers and service access. Under SBC 505.3, an equipment platform is never part of a mezzanine. Work platforms.
-

Catwalk or crossover bridge
Walkways along high walls, between decks and over conveyor lines. Catwalk designs.
-

Elevated office or control room
A raised room that overlooks the floor. In an industrial building, the code lets a control-equipment mezzanine be fully glazed. Raised offices.
03Framing
How Is a Seattle Mezzanine Framed and Braced?
Every frame on this page is designed to resist earthquake motions, together with anything fixed to it (SBC 1613.1). The framing sets the column spacing, the depth of the structure and how the frame resists sideways shaking. Braced bays use diagonal steel between columns. A moment frame stiffens the beam-to-column joints instead, so aisles stay free of braces. The code's tables place each building in a Seismic Design Category. In Category D, E or F, steel follows AISC 341, except where ASCE 7 allows otherwise (SBC 2205.2.1.2). When soil properties are unknown, the code starts from Site Class D (SBC 1613.2.2). Your engineer sets the seismic design and the slab anchorage for your site. Read more on seismic mezzanine design in Seattle.
| Framing | Typical spans | Sideways bracing | Best fit |
|---|---|---|---|
| Bolted cold-formed sections | Shorter bays | Braced bays between columns | Smaller decks where extra columns are fine |
| Hot-rolled beams and columns | Longer, in one or both directions | Braced bays or moment frames | Fewer columns under a shallow structure |
| Bar joists or trusses | The widest | Braced bays at chosen column lines | Space for light fixtures, sprinkler pipe and ductwork |
| Moment (rigid) frame | Set by the design | Stiff beam-to-column joints | No diagonal braces across aisles or forklift paths |
| Rack- or shelving-supported | The rack or shelving bay | Rack frames designed to RMI ANSI/MH 16.1 (SBC 2209.1) | Storage and walk deck in one structure |
04Deck surface
Which Deck Surface Should Your Mezzanine Get?
Match the surface to what rolls, drops or stands on it. Board laid over corrugated steel deck is a common floor for cartons and light storage. Smooth resin or composite panels suit carts and pallet jacks. Open bar grating keeps light and air moving and lets sprinkler water fall through. Steel plate stands up to hard wear, and concrete on form deck is the heaviest, quietest choice. Washington's workplace rule says every walking surface must carry its maximum intended load (WAC 296-24-73505). Sprinkler and fire questions are settled in SDCI plan review. Compare the surfaces on our mezzanine decking in Seattle page.
-

Wood board over steel deck
Panels laid on corrugated steel deck, for cartons and light storage.
-

Resin board or composite panels
A smooth, hard-wearing floor for carts, totes and pallet jacks.
-

Steel bar grating
An open grid that passes light, air and sprinkler water.
-

Steel floor plate
Raised-pattern plate for heavy traffic and rough wear.
-

Concrete on form deck
Poured over steel form deck for the heaviest, quietest floor.
05Stairs and ladders
Which Stairs or Ladders Meet Washington Rules?
The right stair depends on how often people go up and what they bring with them. Washington wants standard stairs where people travel between levels as a routine, once a week or more (WAC 296-24-74005). Those stairs sit between 30 and 50 degrees (WAC 296-24-74010). Ship and alternating tread stairs are allowed only where standard stairs are shown not to be feasible. On stairs built since October 1, 2020, the stair rail and the handrail must be separate parts. The stair rail stands at least 42 inches high; the handrail sits at 30 to 38 inches (WAC 296-24-74015). For exit stairs, the Seattle Building Code adds its own riser, tread and handrail rules (SBC 1011). See stairs, railings and gates in Seattle.
-

Standard stairs
For daily trips: 30 to 50 degrees, with the stair rail and handrail kept as two parts.
-

Steep-access stairs
Ship or alternating tread stairs for tight spots. As an exit, an alternating tread device serves only small F, H or S mezzanines (SBC 1011.14).
-

Stair landings
They turn a long run; each one is at least the stair's width and 30 in deep.
-

Fixed ladders
Occasional service access, with a swinging gate or an offset path at the opening.
06Gates
Which Gates Belong at Your Pallet Zones and Stair Heads?
Every edge where pallets land needs a gate, and ladderway openings need a swinging gate or an offset path. Washington's fall protection rule starts at 4 feet, and open sides get a standard guardrail (WAC 296-880-20005). If a rail section comes off for loading, a worker must stay at the opening. That worker wears fall protection and has one task: warning others. Our choice for pallet zones is a two-gate design: one gate always closes the edge, so no rail is removed. That is our design reading of the rule, and your safety lead confirms it.
-

Two-gate drop zone
As the outer gate lifts for the forklift, the inner gate closes off the pallet bay. Our default for pallet zones.
-

Pivot pallet gate
One frame swings between two positions, so the ledge side or the deck side is always shut.
-

Self-closing swing gate
Shuts by itself at stair heads and small access openings.
-

Sliding pallet gate
Runs along a track to open the loading edge; suits openings used now and then.
-

Rolling pallet gate
Rolls back on wheels to clear a wide opening for long loads.
-

Gate beacon and alarm
A beacon and buzzer warn the floor whenever the gate stands open.
07Lifts
When Does a Seattle Mezzanine Need a Lift?
Consider a lift when no forklift can get to the deck edge. It also helps when carts shuttle between levels through each shift. A VRC (vertical reciprocating conveyor) lifts goods from floor to deck, and people take the stairs. A smaller material lift delivers carts of totes to a gated landing. If a forklift does reach the edge, a gated pallet zone may be enough on its own. Every lift has its own gate and guarding, written into your quote. Read more about mezzanine lifts.
-

Vertical reciprocating conveyor (VRC)
Pallets and carts travel on a guarded platform between the floor and the deck.
-

Material lift with deck gate
Totes and carts arrive at a gated landing, and the gate stays shut until the lift is level.
08Add-ons
Which Add-Ons Do Seattle Buyers Request?
Buyers most often add an office on the deck and lighting and sprinkler lines below it. Steel for conveyor runs, load signs and guards at column bases come next. In Seattle, every warehouse and storage area needs durable signs showing the design live load (SBC 107.1). So does any other floor designed above 125 psf. The certificate of occupancy waits until those signs are up (SBC 107.2). An office on the deck must respect the openness rule in SBC 505.2.3. Walls stop at 42 inches unless an exception applies. Every add-on is priced in the same written quote as the frame.
-

Modular office on the deck
A windowed office set on a deck rated for its weight.
-

Lights and sprinklers below
Fixtures and sprinkler lines under the deck, shown on the permit drawings.
-

Conveyor supports and chutes
Steel to carry conveyor runs and drop chutes down to the floor.
-

Load signs
Durable plates stating the design load, which Seattle requires in storage areas.
-

Column guards
Yellow steel collars that protect columns and rack ends along forklift aisles.
Sources, read November 2026: Seattle Building Code 2021, Section 505 · Seattle Building Code 2021, Chapter 1 (permits, documents, load signs) · Seattle Building Code 2021, Chapter 10 (means of egress) · Seattle Building Code 2021, Chapter 16 (loads and Section 1613 earthquake design) · Seattle Building Code 2021, Chapter 22 (steel and storage racks) · WAC 296-24-73505 · WAC 296-24-74005 · WAC 296-24-74010 · WAC 296-24-74015 · Chapter 296-880 WAC, Unified safety standards for fall protection · SDCI, Multifamily and Commercial STFI Checklist · SDCI, Construction Permit: Addition or Alteration
09Questions
Mezzanine Options Questions, Answered
Do you supply the options as well as install them in Seattle?
Yes. We take the order for every option on this page, and our own installers fit it. The list covers frame, deck, stairs, rails, gates, lifts and add-ons. We do not make the steel or seal drawings. A Washington-licensed engineer seals the set, and we coordinate it with the SDCI permit.
Source: SBC 106.5.2
How do I check the lead time for an option in Seattle?
Press the lead-time button on its card, and the reply gives today's lead time for that item. The full schedule also depends on permit review. SDCI says it aims to finish a first review of simple applications in two to three weeks. For complex ones, the goal is eight weeks. That is SDCI's goal, not a promise of ours.
Source: SDCI, Construction Permit: Addition or Alteration
Do the options I pick change the Seattle permit?
Some do. A new mezzanine is structural work, so SDCI reviews full plans instead of issuing a field-inspection permit. Enclosed offices, stairs, lifts and sprinkler changes all appear on those plans. We settle the options first, and then the engineer draws and seals the set.
Source: SDCI STFI checklist; SBC 505.2.3
Does every mezzanine option need seismic bracing in Seattle?
Every option needs earthquake design: the frame and the parts fixed to it are designed for earthquake motions (SBC 1613.1). How the frame resists them varies: braced bays, a moment frame, or rack frames designed to RMI ANSI/MH 16.1. Your engineer sets the bracing and anchorage for your site, so no option skips that step.
Source: SBC 1613.1, 2209.1
10Request for quote
Price an Option or Check Its Lead Time
Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.
- 1You describe the room, the load and the timing.
- 2We check the size against the code that applies at your address.
- 3You get a written scope and quote for supply and installation.
Prefer to talk? (425) 790-3315
Keep Planning Your Mezzanine
All mezzanine servicesOne list of the decks, platforms and offices we put in.Read more
Seismic mezzanine designSBC 1613, rack inspections and Seattle's mapped soft soils.Read more
Mezzanine cost per square footBudget ranges to plan with, and the Seattle items that move them.Read more
Seattle permits and codeSDCI steps, the one-half rule, load signs and DOSH.Read more
Industries we serveTwenty kinds of facilities and what each one builds.Read more
Mezzanine installation in SeattleMezzanines supplied and installed across Seattle.Read more

Add Usable Floor in Your Seattle Building
- Sized to the load you will put on the deck.
- Planned for the code that applies at your address.
- Designed with the engineer for earthquake forces.