Warehouse Catwalk Systems and Crossover Bridges in Seattle
A warehouse catwalk system links raised steel walkways over the floor. People use it to reach shelving tiers, machines, platforms or the far side of a conveyor. We furnish catwalks and crossover bridges to Seattle plants and warehouses and set them in place with our own installers.

What Is a Warehouse Catwalk System in Seattle?
A warehouse catwalk system joins grated steel walkways above the floor into one route network for the places people must reach. Routes pass between shelving tiers, run beside machines for service, or climb to a platform. Washington's walking-working surface rule names it outright: a runway is "An elevated walking-working surface, such as a catwalk" (WAC 296-24-73502). So the state's edge, rail and stair rules apply to it.
We route catwalks along the paths people already walk, as part of our mezzanine installation in Seattle.
What Is an Elevated Industrial Walkway, and When Does It Need a Work Plan?
An elevated industrial walkway is a single long path raised over or beside a process line: tanks, ovens, conveyors or rows of machines. In Washington, WAC 296-880-10020 asks for a written fall protection work plan wherever workers face fall hazards of ten feet or more. The same section says a plan "is not required where the use of a guardrail system eliminates the fall hazard." So we rail every open side of a high walkway, which removes the need for a written plan at that edge.
Along the Ballard-Interbay waterfront, PSRC describes "commercial fishing, boat building and repair, as well as wharfs, railyards, warehouses and general industrial facilities." In buildings like those, a raised walkway keeps service trips off a busy floor.
How Is a Crossover Bridge Railed in Washington?
A crossover bridge is a short raised span with steps at each end. People go over a conveyor, pipe run or machine instead of around it. Each crossover comes from us as a finished unit with its steps and railing, ready for our crew to set. Washington spells out the rail in WAC 296-880-40005. The top rail sits 39 to 45 inches high. A mid rail runs halfway down, and posts stand no more than 8 feet apart.
- Pipe rails at least 1.5 inches nominal outside diameter.
- Structural steel rails of 2 x 2 x 3/8 inch angles, or shapes of equal bending strength.
- A 200-pound load within 2 inches of the top edge, outward or downward, without the top dropping below 39 inches.
- Heavier stock, closer posts or bracing where people truck or handle materials against the rail.

What Load Does a Catwalk Carry in Seattle?
Seattle's Table 1607.1 gives "Catwalks for maintenance and service access" a uniform 40 psf and a concentrated 300 pounds. "Walkways and elevated platforms (other than exitways)" are 60 psf. A walkway that also holds stock, such as an aisle deck between shelving tiers, is rated for storage instead. Section 1607.3 says the design load is the heaviest the use will bring. So we ask about carts and stock as well as foot traffic.
Your engineer sets the final rating. Price the length and rating with the mezzanine cost guide.

Which Toeboards and Gates Does a Washington Catwalk Need?
Toeboards wherever someone can pass below, and a gate or offset at every ladder or stair opening. WAC 296-880-20005 adds a standard toeboard to the guardrail in three cases: people pass beneath, machinery moves below, or falling material could create a hazard. A standard toeboard is at least 3.5 inches high, with openings no larger than 1 inch. Ladderway and platform openings need "a swinging gate or so offset that a person cannot walk directly into the hole."
Stock piled above the toeboard needs paneling or screening up to the mid rail or top rail (WAC 296-880-40005). See gate styles on stairs, railings and gates.

Which Deck Surface Suits a Seattle Catwalk?
Bar grating, in most cases. It is light, it drains water and grit, and light and air pass through it. Floor plate suits routes where small parts could drop through grating onto people below. Smooth panels suit walkways where carts roll. Sprinkler and fire questions about a solid deck go to plan review, so we settle the surface early.
Like anything fixed to a Seattle building, a catwalk is designed to resist earthquake motions (SBC 1613.1). Your engineer sets the seismic design for your site; read seismic mezzanine design. Compare surfaces on mezzanine decking and see walkway styles on mezzanine options. The permit path is on Seattle permits and code.
What Does a Catwalk Project Include?
A catwalk job covers the walking route, a grating or plate deck, and rails and toeboards along open sides. Stairs or ladders go at both ends, and crossover bridges come as complete units. The order is placed with us, and our own installers put the structure up. We measure the room, settle the layout and loads with you, and coordinate the sealed drawings and the permit with the Seattle Department of Construction and Inspections. The same team takes it from the first site visit to the final inspection.
- Site visit: clear height, column lines, slab, doors and forklift routes.
- Layout and loads: deck size, stair and gate positions, and the design load for the use.
- Drawings and permit: plans sealed by a Washington-licensed engineer, filed with the building department.
- Supply: the columns, beams, decking, stairs, rails and gates, plus a lift when the plan calls for one, delivered to your dock.
- Install and sign-off: our crew erects it, anchors it and walks the inspector through it.
Sources, read November 2026: Seattle Building Code 2021, Chapter 16 (loads and Section 1613 earthquake design) · WAC 296-24-73502 · Chapter 296-880 WAC, Unified safety standards for fall protection · Seattle Building Code 2021, Chapter 1 (permits, documents, load signs) · SDCI, Multifamily and Commercial STFI Checklist · Puget Sound Regional Council, Industrial Lands Analysis
01Questions
Catwalk Questions, Answered
Does a catwalk or crossover bridge in Seattle need a building permit?
Yes. SBC 106.1 requires a building permit before a structure is built, enlarged or altered. New mezzanine framing is structural work, and SDCI's checklist sends structural work to plan review, not to the quicker subject-to-field-inspection permit.
Source: SBC 106.1; SDCI STFI checklist
Do catwalks in Seattle need guardrails on both sides?
Yes, on every open side where workers face a fall of four feet or more (WAC 296-880-20005). A standard guardrail is the usual protection. A side closed off by a wall or a solid shelving face can be different, and each edge is drawn to the rule.
Source: WAC 296-880-20005
Does a high crossover in Seattle need a written fall protection work plan?
Not where guardrails eliminate the fall hazard. WAC 296-880-10020 requires a written plan for areas with fall hazards of 10 feet or more. It exempts areas where a guardrail system removes the hazard, which is why we rail high crossovers on every open side.
Source: WAC 296-880-10020
02Request for quote
Ask for a Written Quote
Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.
- 1You describe the room, the load and the timing.
- 2We check the size against the code that applies at your address.
- 3You get a written scope and quote for supply and installation.
Prefer to talk? (425) 790-3315

Add Usable Floor in Your Seattle Building
- Sized to the load you will put on the deck.
- Planned for the code that applies at your address.
- Designed with the engineer for earthquake forces.