Mezzanine Decking for Seattle Warehouses and Plants

Mezzanine decking is the walking surface laid over the steel joists, and we supply and install it on new and existing mezzanines in Seattle. We pick the surface by what rolls, stands and spills on it, then size it to the code load for that use.

Large free-standing galvanised steel mezzanine with yellow guardrail and two stairs, shelving of boxes on the deck, seen from above

Which Mezzanine Deck Surfaces Do We Install in Seattle?

We supply and install five deck surfaces in Seattle: wood board over corrugated steel deck, resin or composite panels, steel bar grating, steel floor plate, and concrete cast over a steel form deck. The steel frame carries the load. The surface decides how carts roll, how light and air pass, and how the floor wears over the years.

We fit the surface to your use as part of our mezzanine installation in Seattle.

Mezzanine Deck Surfaces Side by SideOur general summary. Your engineer confirms the rating for your use.
SurfaceSuitsThink about
Wood board over steel deckLight storage and foot trafficKeep it dry; heavy wheels wear it down
Resin or composite panelsCarts, pallet jacks and tote dolliesAsk for static-control or fire-rated grades where your use needs them
Steel bar gratingCatwalks, equipment platforms, floors that pass light and airSmall parts drop through; small wheels ride rough
Steel floor plateHard wear and heavy point loadsHeavier and noisier underfoot than panels
Concrete on steel form deckThe heaviest and quietest floorsThe heaviest surface; the frame is designed around its weight
Diamond-pattern steel plate decking on a mezzanine, edged by a yellow guardrail
Illustration: galvanised floor plate at the head of a mezzanine stair.

How Do You Choose a Deck Surface by Use?

Start with the use, because the Seattle Building Code sets a minimum floor load for each one and the surface has to carry it. Offices start at 50 psf; walkways and elevated platforms at 60; light storage at 125 and heavy storage at 250 (SBC Table 1607.1). After the load, think about wheels, spills, light and noise. The table pairs each use with surfaces that often fit it.

Deck Surfaces by Use in SeattleLoads from 2021 SBC Table 1607.1. Surface picks are our general guidance.
Use on the deckMinimum live loadSurfaces that often fit
Offices50 psfPanels or concrete for a quiet, finished floor
Catwalks for maintenance and service access40 psfBar grating
Walkways and elevated platforms60 psfBar grating or floor plate
Light storage warehouse125 psfWood board or panels
Light manufacturing125 psfPanels or floor plate
Heavy storage warehouse250 psf, more if the stock needs itFloor plate or concrete
Heavy manufacturing250 psfFloor plate or concrete

The drawings show the design load for each floor area (SBC 1603.1.1). In Seattle, every warehouse and storage area also gets a durable sign stating it (SBC 107.1). See storage decks on our warehouse storage platform page.

When Do Resin or Composite Panels Suit a Mezzanine?

Panels suit decks where wheels move all shift: carts, pallet jacks, tote dollies and tuggers. They lie flat and tight over the joists, so small wheels roll smoothly and footsteps stay quiet. Some grades are made to control static or resist fire, so ask for the grade your process calls for. The panel rating must still cover the point load under a loaded jack wheel.

See panel decks next to the other surfaces in our mezzanine options gallery.

Dark grey resin panel deck with a rolling cart of totes and yellow guardrail at the edge
Illustration: a dark resin panel deck carrying a cart of totes.

Where Does Bar Grating Work Best on a Mezzanine?

Pick bar grating when light, air or sprinkler water should pass through the floor, or when grit should fall clear. Grating is light and tough, which is why catwalks and equipment platforms so often use it. Whether a grating deck changes the sprinkler layout is a question for SDCI plan review on your building. In a building that must be sprinklered, SBC 505.3.2 wants equipment platforms "fully protected by sprinklers above and below the platform, where required by the standards referenced in Section 903.3."

Read about grating walkways on our catwalks and crossover bridges page, and equipment decks on the industrial work platforms page.

Galvanised bar-grating deck surface edged by a yellow guardrail beside tall windows
Illustration: looking up through a bar-grating deck toward the roof timbers.

Which Jobs Call for Floor Plate or a Concrete Deck?

Use floor plate for hard wear and heavy point loads, and concrete for the heaviest, quietest floor. Floor plate is a patterned steel sheet fixed over the frame. Concrete is cast on corrugated steel form deck and is by far the heaviest choice, so beams, columns, anchorage and bracing are designed around it. Your engineer sets the seismic design for your site under SBC 1613.

Read how the frame is planned for earthquakes on our seismic design page.

Edge of a concrete mezzanine floor where the slab sits on ribbed steel form deck, a yellow rail above
Illustration: a concrete floor on corrugated form deck at a mezzanine edge.

Can an Old Seattle Mezzanine Get a New Deck Surface?

Often, yes, once an engineer confirms the frame can carry the new surface, since a heavier deck adds dead load. SBC 106.1 requires a permit to alter or repair a structure. Seattle's small-work exemption stops at $6,000 of work and never covers changes to loadbearing support (SBC 106.2), so ask SDCI before the old deck comes up. Washington's WAC 296-24-73505 adds that a qualified person performs or supervises any repair touching a surface's structural integrity. A new rating means new load signs (SBC 107.1).

The Seattle permit guide walks through SDCI review, and the cost guide shows how the surface moves the price.

What Does a Mezzanine Deck Project Include?

On a deck job we match the surface to the wheels, feet and stock it will see, lay out the panels or grating over the joists, and get the engineer's sign-off on the frame when the new surface weighs more. The order is placed with us, and our own installers put the structure up. We measure the room, settle the layout and loads with you, and coordinate the sealed drawings and the permit with the Seattle Department of Construction and Inspections. The same team takes it from the first site visit to the final inspection.

  • Site visit: clear height, column lines, slab, doors and forklift routes.
  • Layout and loads: deck size, stair and gate positions, and the design load for the use.
  • Drawings and permit: plans sealed by a Washington-licensed engineer, filed with the building department.
  • Supply: the columns, beams, decking, stairs, rails and gates, plus a lift when the plan calls for one, delivered to your dock.
  • Install and sign-off: our crew erects it, anchors it and walks the inspector through it.

Sources, read November 2026: Seattle Building Code 2021, Chapter 16 (loads and Section 1613 earthquake design) · Seattle Building Code 2021, Chapter 1 (permits, documents, load signs) · Seattle Building Code 2021, Section 505 · WAC 296-24-73505 · SDCI, Construction Permit: Addition or Alteration

01Questions

Seattle Mezzanine Decking Questions

Which deck surface handles pallet jacks best on a Seattle mezzanine?

A smooth panel deck usually rolls best under pallet jacks and carts, while grating rides rough under small wheels. Whatever the surface, the design must carry the concentrated load the code lists for the use, such as 2,000 pounds for offices and light manufacturing (SBC Table 1607.1).

Source: SBC Table 1607.1

Does a grating deck affect sprinklers in Seattle?

It can. SDCI plan review settles the sprinkler questions for your building, so we plan the deck and the sprinkler layout together. In a building that must be sprinklered, equipment platforms are "fully protected by sprinklers above and below the platform, where required by the standards referenced in Section 903.3" (SBC 505.3.2).

Source: SBC 505.3.2

What load rating should a storage mezzanine deck have in Seattle?

Plan on 125 psf or more for light storage and 250 psf or more for heavy storage, under SBC Table 1607.1, and higher when your stock calls for it. Seattle then wants that design load posted on a durable sign in every warehouse and storage area (SBC 107.1).

Source: SBC Table 1607.1; SBC 107.1

Do I need a permit to re-deck a mezzanine in Seattle?

Plan on it. SBC 106.1 covers altering and repairing structures, and Seattle's $6,000 exemption never covers changes to loadbearing support. SDCI decides for your project, and we prepare what the review needs.

Source: SBC 106.1, 106.2

02Request for quote

Ask for a Written Quote

Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.

  1. 1You describe the room, the load and the timing.
  2. 2We check the size against the code that applies at your address.
  3. 3You get a written scope and quote for supply and installation.

Prefer to talk? (425) 790-3315

Green steel mezzanine spanning wall to wall across a narrow hall, with yellow guardrail and a stair along one wall

Add Usable Floor in Your Seattle Building

  • Sized to the load you will put on the deck.
  • Planned for the code that applies at your address.
  • Designed with the engineer for earthquake forces.
CallRequest a quote