Service area · Auburn, King and Pierce counties
Mezzanine Installation in Auburn, WA
Auburn's industrial buildings line the corridors beside SR 167, where manufacturing, warehousing and distribution share the valley floor. We supply storage mezzanines, work platforms and plant offices to Auburn businesses, and our crew installs each one under the Washington State code.

Do You Install Mezzanines in Auburn, WA?
Yes. We install storage mezzanines, work platforms, parts decks and plant offices in Auburn warehouses and manufacturing buildings. Auburn spans King and Pierce counties, and its comprehensive plan describes a nonresidential land use mix that includes "manufacturing, warehousing, and distribution centers." An Auburn quote follows the same steps as our mezzanine installation in Seattle. The rulebook is what changes: Auburn enforces the state building code, and the City of Auburn takes the permit. Send the address with your request, and we confirm the steps for that parcel.
Where Are Auburn's Industrial Buildings?
Mostly along north-south corridors on the valley floor, beside SR 167. Auburn's 2024 land use element says that for its first 100 years the city was "fully contained to the valley floor," with a downtown and "several north/south heavy commercial and industrial corridors paralleling Highway 167." It describes its industrial lands as "a mix of manufacturing, logistics, and warehousing along with the space needed to store materials and vehicles." Those areas move goods by rail or truck, which "necessitates loading docks/bays, ample area for truck movement, and convenient access to robust rail and road infrastructure."
The city carries that designation out through its M-1 Light Industrial and M-2 Heavy Industrial zones, along with an airport landing field district.

What Work Fills Auburn's Industrial Buildings?
Manufacturing above all, with more than a fifth of the city's jobs. Auburn's 2024 economic development element counts "about 46,383 jobs located in Auburn" as of 2019, and says manufacturing "now accounts for over 20% of jobs in the City." It also records a fall in retail alongside "an increase in wholesale trade." One of its policies aims to retain and recruit businesses that support "an already robust aerospace industry." Those uses call for different decks. Plants tend to need parts decks and work platforms, and wholesale and distribution buildings need storage floor above the racking.
How Much Mezzanine Can an Auburn Building Hold?
Under the state edition, the mezzanines in a room may add up to a third of its floor area, all of them counted together. Two exceptions raise the cap. Type I or II buildings that house special industrial occupancies may reach two-thirds. With automatic sprinklers plus an emergency voice/alarm system, a Type I or II building may go as high as one-half. Auburn may amend the state code, as any Washington city may (RCW 19.27.040), so we confirm the edition in force for your address. Seattle's own one-half limit stops at Seattle's city line and never applies in Auburn.
Seattle area estimator
Deck area your room allows
8,000sq ft
square feet of deck allowed under the Washington State edition: one-third of the room
32,000 sq ft of floor in all, 33% more room to work
- Sprinklered Type I or II building with voice alarmup to 12,000 sq ft
- Headroom check7 ft clear above and below
A planning figure only. Inside Seattle city limits, mezzanines in a room may total one-half of its floor area (Seattle Building Code 2021, Section 505). Most other Washington cities build to the state edition, which keeps one-third (Washington State Building Code 2021, Chapter 5 on UpCodes), and any city may amend it. Your building department and a licensed engineer confirm the number for your address.
Who Issues a Mezzanine Permit in Auburn, WA?
The City of Auburn. Its Community Development Services Department runs building and land use permitting, and Washington law has each city enforce the state building code (RCW 19.27.050). An address inside Auburn files with the city on either side of the county line. WAC 51-50-008 put the state's adopted International Building Code into effect in every county and city on March 15, 2024. We coordinate drawings sealed by a Washington-licensed engineer, then file them for your building.
The use matters too. One of the plan's industrial policies (LU-86) lists indoor manufacturing, processing and assembly, plus "ancillary and necessary warehousing and distribution of finished goods associated with manufacturing and industrial uses." The zoning code decides what your parcel allows, so we check the planned use with the city before the layout is final.
Which Mezzanine Suits an Auburn Plant or Warehouse?
The one that fits what the deck carries and the work that goes on under it. A warehouse mezzanine holds cartons and overflow stock above the racking. An industrial work platform lifts equipment or a production step off the floor. A mezzanine office puts supervisors above the plant, and a modular in-plant office stays on the slab. Washington's DOSH rules require each walking-working surface to support its maximum intended load (WAC 296-24-73505), so we size the deck to your real use.
Earthquake design applies in Auburn as well. Your engineer sets it for your site, as our seismic design page explains.
What Does an Auburn Mezzanine Project Include?
An Auburn job starts at the dock doors. We note how trucks and forklifts move through the building, then the column grid and the clear height under the roof. The order is placed with us, and our own installers put the structure up. We measure the room, settle the layout and loads with you, and coordinate the sealed drawings and the permit with the City of Auburn's Community Development Services Department. The same team takes it from the first site visit to the final inspection.
- Site visit: clear height, column lines, slab, doors and forklift routes.
- Layout and loads: deck size, stair and gate positions, and the design load for the use.
- Drawings and permit: plans sealed by a Washington-licensed engineer, filed with the building department.
- Supply: the columns, beams, decking, stairs, rails and gates, plus a lift when the plan calls for one, delivered to your dock.
- Install and sign-off: our crew erects it, anchors it and walks the inspector through it.
Sources, read November 2026: City of Auburn, Imagine Auburn Comprehensive Plan, Land Use Element (adopted December 2024) · City of Auburn, Imagine Auburn Comprehensive Plan, Economic Development Element (adopted December 2024) · City of Auburn, Community Development (building and land use permitting) · RCW 19.27.050 · RCW 19.27.040 · Washington State Building Code 2021, Chapter 5 on UpCodes · WAC 51-50-008 · WAC 296-24-73505 · Chapter 296-880 WAC, Unified safety standards for fall protection
01Questions
Auburn Mezzanine Questions, Answered
Does an Auburn mezzanine need a building permit?
Plan on one. The City of Auburn enforces the state building code inside its limits, and a mezzanine adds new structure to your building. We confirm Auburn's submittal steps for your parcel before any steel is ordered.
Source: RCW 19.27.050
Does Seattle's one-half mezzanine rule apply in Auburn?
No. That rule is part of the Seattle Building Code and ends at Seattle's city line. Auburn works from the Washington State edition, whose Section 505.2.1 sets one-third of the room as the base limit, plus any amendments the city has made.
Source: WSBC 505.2.1; RCW 19.27.040
Do you serve Auburn buildings on the Pierce County side?
Yes. Auburn spans King and Pierce counties, and we work on both sides of that line. A building inside city limits files its permit with the City of Auburn either way.
Source: RCW 19.27.050
Which safety rules cover the edge of an Auburn mezzanine?
Washington's DOSH rules, which apply statewide. Workers exposed to a fall of 4 feet or more need protection, and a standard guardrail has a top rail 39 to 45 inches high with a midrail halfway down.
Source: WAC 296-880-20005; WAC 296-880-40005
How do I budget a mezzanine for an Auburn building?
Start from the deck area, the load and the frame type. Our mezzanine cost guide lists published planning ranges per square foot, and we send a written quote for your Auburn layout.
02Request for quote
Ask for a Written Quote
Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.
- 1You describe the room, the load and the timing.
- 2We check the size against the code that applies at your address.
- 3You get a written scope and quote for supply and installation.
Prefer to talk? (425) 790-3315

Add Usable Floor in Your Auburn Building
- Sized to the load you will put on the deck.
- Planned for the code that applies at your address.
- Designed with the engineer for earthquake forces.