Industries · Seattle, King, Pierce and Snohomish counties
Industries We Serve in Seattle and the Puget Sound
Twenty kinds of buildings across the region add floor with us, from port-side warehouses to boatyards and data halls. You order the deck, platform or raised office from us. Our installers put it in, as part of our mezzanine installation in Seattle.

02Logistics and distribution
Why Do Puget Sound Distribution Warehouses Build Up?
Because the floor fills before the height does, and open land is scarce. The Northwest Seaport Alliance manages the marine cargo terminals in Seattle and Tacoma. It says it links to the second-largest concentration of distribution centers on the West Coast. Tukwila's draft plan calls its industrial center a major regional distribution hub. The Puget Sound Regional Council's draft land study reports few vacant parcels left in the Kent and Duwamish centers. In our view, building up inside the lease is one answer. A deck takes picking, packing, returns or slow stock, and the dock floor stays clear. Under the Seattle code's Table 1607.1, light storage floors carry at least 125 psf and heavy ones 250 psf.
-

Third-Party Logistics (3PLs) & Distribution Centers
A 3PL gains a pick or storage level inside the clear height it already pays for. We rate the deck for the heaviest client's goods and fit two-gate drop zones where pallets land.
Pages to read: warehouse mezzanines, pick modules and gates and stairs.
-

E-Commerce & Online Retail Fulfillment
The Regional Council's draft study counts 84.5 percent growth in warehousing and storage jobs from 2020 to 2022. Fulfillment teams turn that kind of space into each-pick shelving and pack-out, with totes on conveyor between floors.
Pages to read: pick modules, rack- and shelving-supported decks and catwalks.
-

Cold Storage & Food/Beverage Distribution
The City lists food and beverage processing among the uses in the Duwamish industrial center. Above chilled rooms, a deck holds packaging, labels and dry goods. We pick the surface for the room and write it into your quote.
Pages to read: storage platforms, deck surfaces and gates and stairs.
-

Pharmaceutical & Medical Device Warehousing
Medical supply and pharmacy distributors move kits, cartons and slow stock to an upper level with an easy-clean deck. Your quality program decides what may sit up there; we provide the deck, rails and gates.
Pages to read: warehouse mezzanines, deck surfaces and gates and stairs.
-

HVAC, Plumbing & Electrical Supply Warehouses
By the City's description, the inland Duwamish blocks hold industrial supply companies and construction businesses. Supply houses keep fittings, wire and boxed parts on the deck and leave pipe and conduit racks on the floor.
Pages to read: storage platforms, rack- and shelving-supported decks and material lifts.
03Manufacturing and production
How Do Puget Sound Plants Use Mezzanines and Platforms?
Plants put parts, tool cribs, offices and maintenance rooms on a mezzanine, and machinery on an equipment platform. The City's Duwamish plan notes aerospace suppliers and technology companies in and south of the industrial center. The Regional Council describes activity at the Paine Field center in Everett as dominated by aviation. Light manufacturing floors are designed for 125 psf and heavy ones for 250 psf (Table 1607.1). Seattle's SBC 505.3 keeps an equipment platform out of the floor below, the building area and the story count. Together, a room's equipment platforms can take two-thirds of its area (SBC 505.3.1).
-

Aerospace, Aviation & Defense Manufacturing
Precision shops near Paine Field and the Duwamish use a deck for tooling, inspection benches and spare parts. Equipment platforms stand beside large machines. Our crew follows each site's access and safety rules.
Pages to read: equipment platforms, raised offices and storage platforms.
-

Automotive & Parts Manufacturing
Assembly and component plants feed workstations from parts containers held on a deck overhead. We set column lines away from the conveyor and forklift traffic, and add a stair at each end.
Pages to read: equipment platforms, steel mezzanines and raised offices.
-

Plastics, Packaging & Commercial Printing Plants
Printing and packaging lines need paper, film and corrugated stock close at hand. A deck beside the line holds it, and a walkway platform reaches the press rollers. We size the deck for full rolls.
Pages to read: storage platforms, equipment platforms and gates and stairs.
-

Breweries, Wineries & Distilleries
Seattle's permit records show a 2020 application to turn part of a warehouse into a brewery and restaurant. It included a new mezzanine level. Producers use catwalks over tank tops, platforms at the brewhouse and decks for dry goods.
Pages to read: equipment platforms, catwalks and deck surfaces.
04Vehicle, equipment and marine service
What Do Vehicle, Equipment and Marine Shops Keep Overhead?
Parts, tires, fluids, rigging and records, stored above the work so the bays stay free. Service buildings tend to be tall, and a deck along one wall puts that height to use. Section 505.2 of the Seattle code keeps 7 feet of clear height both over and under the deck. The Regional Council describes Ballard-Interbay as "a working waterfront focused on commercial fishing, boat building and repair". We place columns, stairs and rails around bay doors, hoists and forklift routes. A lift goes in where heavy parts change levels.
-

Auto Dealership Parts Departments & Collision Centers
Behind the parts counter, a deck holds boxed parts, trim and body panels waiting for repair orders. A stair near the counter and a gate at the loading edge keep the trips short.
Pages to read: lofts, material lifts and gates and stairs.
-

Tire Distributors & Commercial Fleet Maintenance Shops
Truck and car tires rack well on a deck, leaving the floor to tire machines and service lanes. Fleet shops add filters, belts and fluids above the bays, on a deck rated for dense stock.
Pages to read: storage platforms, lofts and material lifts.
-

Heavy Equipment, RV & Marine Service Centers
Bays built for motorhomes, boats and loaders often have spare height at the rear. A parts deck or a small office fits there, with columns and the stair kept clear of doors and hoists.
Pages to read: lofts, steel mezzanines and raised offices.
-

Maritime, Boat Building & Marine Repair
Boat builders and repair yards in Ballard-Interbay keep line, buoys and spares on a deck above the hull bays. The City's draft industrial study maps nearly all of the Interbay Dravus and Smith Cove subareas as liquefaction-prone. So the engineer reviews slab and soil during design.
Pages to read: steel mezzanines, storage platforms and lofts.
05Retail, storage and archives
How Do Stockrooms, Self-Storage and Archives Fit More In?
By stacking a second level of stock, units or shelving inside the same walls. These are storage uses under Table 1607.1. The Seattle code's minimum is 125 psf where goods are light and 250 psf where they are heavy. The table also asks for heavier design loads where the stored goods call for them. Loaded shelving and files are dense, so the engineer designs the deck for its real contents. Seattle also wants durable load signs in every warehouse and storage area (SBC 107.1). Inside city limits, the decks in one room may total one-half of its floor area (SBC 505.2.1).
-

Big-Box Retail & Home Improvement Backrooms
Big-box and home improvement stores lift seasonal and bulk goods onto a deck above receiving. The backroom floor stays open for deliveries. A lift or conveyor carries cartons up and down.
Pages to read: lofts, material lifts and gates and stairs.
-

Self-Storage Facilities
A tall self-storage shell can take a second row of units on a steel deck with a walkway in front. SDCI plan review fixes the exits and any accessible route for the upper level.
Pages to read: second floors, steel mezzanines and gates and stairs.
-

Document Archives, Libraries & Museum Storage
Seattle's permit records include a 2024 application to alter a ground floor and its mezzanine for office archive storage. Records rooms, libraries and museum stores double their shelving this way, and we size the deck for shelves packed full.
Pages to read: rack- and shelving-supported decks, steel mezzanines and storage platforms.
06Sports, fitness and recreation
Can a Seattle Gym or Sports Venue Add a Mezzanine?
Yes, though a level the public uses is designed differently from a storage deck. The Seattle code's Table 1607.1 sets 100 psf for gymnasiums. Lobbies and assembly areas with movable seats take the same figure. Live load reduction is not allowed for those rows. Public levels also bring exit rules from Chapter 10 and an accessible route under SBC 1104.4. Levels of 3,000 square feet or less are often exempt from that route, but the exception has listed limits. We settle those points with the engineer and SDCI early in design. Storage and office decks in a gym are the simpler jobs.
-

Health Clubs, Commercial Gyms & CrossFit/Training Facilities
Gyms move rowing machines, stretching mats, gear storage or staff offices to a deck above the lifting floor. Member-use space is drawn for 100 psf, the gymnasium row in Table 1607.1, and SDCI confirms its exits.
Pages to read: steel mezzanines, raised offices and gates and stairs.
-

Indoor Sports Complexes, Turf Fields & Trampoline Parks
Seattle's permit records include a 2025 change of use from mercantile to indoor sports and recreation. The application covered work on the main floor and the mezzanine. Viewing decks with movable seats beside turf and courts carry the 100 psf assembly load.
Pages to read: steel mezzanines, raised offices and viewing and control rooms.
07Government, aviation and technical
What Do Hangars, Bases and Data Halls Use Platforms For?
Spares, tools, offices and access to equipment, all kept clear of the main floor. Hangars usually line one wall with a deck. Technical rooms use a steel platform to carry units or reach cable trays overhead. An equipment-only platform follows SBC 505.3. Which safety rules apply depends on the site. DOSH enforces Washington's own rules at most workplaces, including state and local government. Federal workers and military reservations stay under federal OSHA. Either way, our crew follows each site's access and safety rules.
-

Military Bases & Aviation Hangars
The Regional Council lists military aviation, aircraft maintenance and flight training among the activities at Paine Field. Hangars there and elsewhere keep parts, tools and offices on a wall-side deck, away from the aircraft floor.
Pages to read: storage platforms, raised offices and gates and stairs.
-

Data Centers & Telecom Facilities
Platforms here hold electrical cabinets and cable trays above the equipment rows, with spares stored to one side. We do not install raised access floors, which are a separate product; read what counts as a mezzanine.
Pages to read: equipment platforms, catwalks and storage platforms.
Sources, read November 2026: Seattle Building Code 2021, Section 505 · Washington State Building Code 2021, Chapter 5 on UpCodes · Seattle Building Code 2021, Chapter 1 (permits, documents, load signs) · Seattle Building Code 2021, Chapter 11 (accessibility) · Seattle Building Code 2021, Chapter 16 (loads and Section 1613 earthquake design) · City of Seattle OPCD, Greater Duwamish MIC Subarea Plan (review draft) · City of Seattle, Industrial and Maritime Strategy Draft EIS, Soils and Geology · City of Seattle open data, Building Permits (mezzanine records since 2019) · City of Tukwila, Comprehensive Plan, Regional Centers element (draft) · Puget Sound Regional Council, Industrial Lands Analysis · Northwest Seaport Alliance, Who We Are · OSHA, Washington State Plan
08Questions
Industry Questions, Answered
Will a mezzanine fit my kind of facility in Seattle?
It usually will if the room is tall enough. The Seattle code asks for 7 feet of clear height above and below the deck (SBC 505.2). Inside city limits, the mezzanines in one room may total one-half of its floor area (SBC 505.2.1). The Washington State edition most other cities use keeps one-third. Send the room size, clear height and use, and we suggest a type.
Source: SBC 505.2, 505.2.1; Washington State Building Code 505.2.1
What load rating does my industry need in Seattle?
The use on the deck sets it. In Table 1607.1 of the Seattle code, offices start at 50 psf and gymnasiums at 100 psf. Light or heavy storage takes 125 or 250 psf, and manufacturing uses the same two figures. The deck is designed for the largest load its use will bring (SBC 1607.3). Your engineer sets the final figure.
Source: SBC Table 1607.1, 1607.3
Do Seattle storage mezzanines need load signs?
Yes. Seattle wants the design live load posted on durable signs in every warehouse and storage area (SBC 107.1). The same goes for any other floor designed above 125 psf. No certificate of occupancy is issued before the signs are in place (SBC 107.2). The rule sits in Seattle's own Chapter 1 of the building code.
Source: SBC 107.1, 107.2
Can a Seattle facility keep running while the deck goes in?
Usually, yes. We settle the work zone, delivery times and any shutdown window with you ahead of delivery. Then we plan the install around your shifts. Your quote lists each step in order.
09Request for quote
Tell Us What Your Facility Does
Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.
- 1You describe the room, the load and the timing.
- 2We check the size against the code that applies at your address.
- 3You get a written scope and quote for supply and installation.
Prefer to talk? (425) 790-3315
Plan the Deck for Your Facility
All mezzanine servicesOne list of the decks, platforms and offices we put in.Read more
Mezzanine options and designsEvery type, deck, stair and gate we supply and install.Read more
Seismic mezzanine designSBC 1613, rack inspections and Seattle's mapped soft soils.Read more
Seattle permits and codeSDCI steps, the one-half rule, load signs and DOSH.Read more
Service areasSeattle districts, nearby cities and the three counties we cover.Read more
Mezzanine installation in SeattleMezzanines supplied and installed across Seattle.Read more

Add Usable Floor in Your Seattle Building
- Sized to the load you will put on the deck.
- Planned for the code that applies at your address.
- Designed with the engineer for earthquake forces.