Seattle and the Puget Sound industrial areasLicensed and insured(425) 790-3315

Seattle Mezzanine Installation (425) 790-3315 Request a quote

Industries · Seattle, King, Pierce and Snohomish counties

Industries We Serve in Seattle and the Puget Sound

Twenty kinds of buildings across the region add floor with us, from port-side warehouses to boatyards and data halls. You order the deck, platform or raised office from us. Our installers put it in, as part of our mezzanine installation in Seattle.

Green steel mezzanine spanning wall to wall across a narrow hall, with yellow guardrail and a stair along one wall

02Logistics and distribution

Why Do Puget Sound Distribution Warehouses Build Up?

Because the floor fills before the height does, and open land is scarce. The Northwest Seaport Alliance manages the marine cargo terminals in Seattle and Tacoma. It says it links to the second-largest concentration of distribution centers on the West Coast. Tukwila's draft plan calls its industrial center a major regional distribution hub. The Puget Sound Regional Council's draft land study reports few vacant parcels left in the Kent and Duwamish centers. In our view, building up inside the lease is one answer. A deck takes picking, packing, returns or slow stock, and the dock floor stays clear. Under the Seattle code's Table 1607.1, light storage floors carry at least 125 psf and heavy ones 250 psf.

03Manufacturing and production

How Do Puget Sound Plants Use Mezzanines and Platforms?

Plants put parts, tool cribs, offices and maintenance rooms on a mezzanine, and machinery on an equipment platform. The City's Duwamish plan notes aerospace suppliers and technology companies in and south of the industrial center. The Regional Council describes activity at the Paine Field center in Everett as dominated by aviation. Light manufacturing floors are designed for 125 psf and heavy ones for 250 psf (Table 1607.1). Seattle's SBC 505.3 keeps an equipment platform out of the floor below, the building area and the story count. Together, a room's equipment platforms can take two-thirds of its area (SBC 505.3.1).

04Vehicle, equipment and marine service

What Do Vehicle, Equipment and Marine Shops Keep Overhead?

Parts, tires, fluids, rigging and records, stored above the work so the bays stay free. Service buildings tend to be tall, and a deck along one wall puts that height to use. Section 505.2 of the Seattle code keeps 7 feet of clear height both over and under the deck. The Regional Council describes Ballard-Interbay as "a working waterfront focused on commercial fishing, boat building and repair". We place columns, stairs and rails around bay doors, hoists and forklift routes. A lift goes in where heavy parts change levels.

05Retail, storage and archives

How Do Stockrooms, Self-Storage and Archives Fit More In?

By stacking a second level of stock, units or shelving inside the same walls. These are storage uses under Table 1607.1. The Seattle code's minimum is 125 psf where goods are light and 250 psf where they are heavy. The table also asks for heavier design loads where the stored goods call for them. Loaded shelving and files are dense, so the engineer designs the deck for its real contents. Seattle also wants durable load signs in every warehouse and storage area (SBC 107.1). Inside city limits, the decks in one room may total one-half of its floor area (SBC 505.2.1).

06Sports, fitness and recreation

Can a Seattle Gym or Sports Venue Add a Mezzanine?

Yes, though a level the public uses is designed differently from a storage deck. The Seattle code's Table 1607.1 sets 100 psf for gymnasiums. Lobbies and assembly areas with movable seats take the same figure. Live load reduction is not allowed for those rows. Public levels also bring exit rules from Chapter 10 and an accessible route under SBC 1104.4. Levels of 3,000 square feet or less are often exempt from that route, but the exception has listed limits. We settle those points with the engineer and SDCI early in design. Storage and office decks in a gym are the simpler jobs.

07Government, aviation and technical

What Do Hangars, Bases and Data Halls Use Platforms For?

Spares, tools, offices and access to equipment, all kept clear of the main floor. Hangars usually line one wall with a deck. Technical rooms use a steel platform to carry units or reach cable trays overhead. An equipment-only platform follows SBC 505.3. Which safety rules apply depends on the site. DOSH enforces Washington's own rules at most workplaces, including state and local government. Federal workers and military reservations stay under federal OSHA. Either way, our crew follows each site's access and safety rules.

Sources, read November 2026: Seattle Building Code 2021, Section 505 · Washington State Building Code 2021, Chapter 5 on UpCodes · Seattle Building Code 2021, Chapter 1 (permits, documents, load signs) · Seattle Building Code 2021, Chapter 11 (accessibility) · Seattle Building Code 2021, Chapter 16 (loads and Section 1613 earthquake design) · City of Seattle OPCD, Greater Duwamish MIC Subarea Plan (review draft) · City of Seattle, Industrial and Maritime Strategy Draft EIS, Soils and Geology · City of Seattle open data, Building Permits (mezzanine records since 2019) · City of Tukwila, Comprehensive Plan, Regional Centers element (draft) · Puget Sound Regional Council, Industrial Lands Analysis · Northwest Seaport Alliance, Who We Are · OSHA, Washington State Plan

08Questions

Industry Questions, Answered

Will a mezzanine fit my kind of facility in Seattle?

It usually will if the room is tall enough. The Seattle code asks for 7 feet of clear height above and below the deck (SBC 505.2). Inside city limits, the mezzanines in one room may total one-half of its floor area (SBC 505.2.1). The Washington State edition most other cities use keeps one-third. Send the room size, clear height and use, and we suggest a type.

Source: SBC 505.2, 505.2.1; Washington State Building Code 505.2.1

What load rating does my industry need in Seattle?

The use on the deck sets it. In Table 1607.1 of the Seattle code, offices start at 50 psf and gymnasiums at 100 psf. Light or heavy storage takes 125 or 250 psf, and manufacturing uses the same two figures. The deck is designed for the largest load its use will bring (SBC 1607.3). Your engineer sets the final figure.

Source: SBC Table 1607.1, 1607.3

Do Seattle storage mezzanines need load signs?

Yes. Seattle wants the design live load posted on durable signs in every warehouse and storage area (SBC 107.1). The same goes for any other floor designed above 125 psf. No certificate of occupancy is issued before the signs are in place (SBC 107.2). The rule sits in Seattle's own Chapter 1 of the building code.

Source: SBC 107.1, 107.2

Can a Seattle facility keep running while the deck goes in?

Usually, yes. We settle the work zone, delivery times and any shutdown window with you ahead of delivery. Then we plan the install around your shifts. Your quote lists each step in order.

09Request for quote

Tell Us What Your Facility Does

Tell us where the building is, how much clear height you have and what the deck has to carry. A local installer reviews it, asks what is missing and sends a written quote for the Seattle-area job.

  1. 1You describe the room, the load and the timing.
  2. 2We check the size against the code that applies at your address.
  3. 3You get a written scope and quote for supply and installation.

Prefer to talk? (425) 790-3315

Forest-green steel mezzanine with X-braced bays, yellow guardrail and a straight stair in a hall lit by north windows

Add Usable Floor in Your Seattle Building

  • Sized to the load you will put on the deck.
  • Planned for the code that applies at your address.
  • Designed with the engineer for earthquake forces.
CallRequest a quote